Engineering Drawing Number field is now pulling the correct information (P-7470).
TC-06002-00
Pass
UAT1
5/29/2025 11:01 AM
5/29/2025 11:01 AM
BOM and BOM revision permission violation resolved (PFV-7469)
TC-06002-00
Info
UAT1
5/28/2025 11:55 AM
5/28/2025 11:55 AM
The verbiage ***If the Scheduling Method is Backward, populate the Supply Required by Date and Production End Date. needs to be removed from the execution steps.
TC-06002-00
Info
UAT1
5/28/2025 9:43 AM
5/28/2025 9:43 AM
Select "exclude from supply planning", if necessary, step is not listed.
TC-06002-00
Fail
UAT1
5/28/2025 9:29 AM
5/28/2025 9:29 AM
Permission failure trying to edit manufacturing work center under the operations tab.
TC-06002-00
Fail
UAT1
5/28/2025 9:09 AM
5/28/2025 9:09 AM
Engineering Drawing Number is incorrect. It is pulling the drawing revision level.