View related Test Case
TC Number Result Type Test Phase Image Date Time Date Time Added Notes Image Data
TC-00016-00 Pass UAT1 6/5/2025 8:15 AM 6/5/2025 8:15 AM This proves that the new part for the second test of TC-00016 successfully made it to NetSuite SB3, with the correct BOM.
TC-00016-00 Info UAT1 6/5/2025 8:10 AM 6/5/2025 8:10 AM This shows the ESIRelease step as Executed (for the second test of TC-00016), which proves that the XML file was generated.
TC-00016-00 Info UAT1 6/5/2025 8:04 AM 6/5/2025 8:04 AM This shows Ed creating the second part for this test (TC00016MANFQA2), with a BOM (73112 as the raw material the part is made from), and the creation of the Change Notice.
TC-00016-00 Fail UAT1 6/4/2025 3:41 PM 6/4/2025 3:41 PM After looking at this test again after we thought it had passed, we realized that the BOM is not showing up in NetSuite.
TC-00016-00 Pass UAT1 6/4/2025 2:31 PM 6/4/2025 2:31 PM After resolving the defect, the XML was processed successfully.
TC-00016-00 Fail UAT1 6/4/2025 2:04 PM 6/4/2025 2:04 PM Integration failed; field erroneously marked as required.
TC-00016-00 Info UAT1 6/4/2025 2:04 PM 6/4/2025 2:04 PM Integration failed; field erroneously marked as required.
TC-00016-00 Info UAT1 6/4/2025 1:15 PM 6/4/2025 1:15 PM Windchill workflow processed through Product Eng.; XML file created.
TC-00016-00 Info UAT1 6/4/2025 12:57 PM 6/4/2025 12:57 PM Change Notice created for the new part.
TC-00016-00 Info UAT1 6/4/2025 12:55 PM 6/4/2025 12:55 PM Part is created with a BOM in Windchill.
× Reported Image