This proves that the new part for the second test of TC-00016 successfully made it to NetSuite SB3, with the correct BOM.
TC-00016-00
Info
UAT1
6/5/2025 8:10 AM
6/5/2025 8:10 AM
This shows the ESIRelease step as Executed (for the second test of TC-00016), which proves that the XML file was generated.
TC-00016-00
Info
UAT1
6/5/2025 8:04 AM
6/5/2025 8:04 AM
This shows Ed creating the second part for this test (TC00016MANFQA2), with a BOM (73112 as the raw material the part is made from), and the creation of the Change Notice.
TC-00016-00
Fail
UAT1
6/4/2025 3:41 PM
6/4/2025 3:41 PM
After looking at this test again after we thought it had passed, we realized that the BOM is not showing up in NetSuite.
TC-00016-00
Pass
UAT1
6/4/2025 2:31 PM
6/4/2025 2:31 PM
After resolving the defect, the XML was processed successfully.
TC-00016-00
Fail
UAT1
6/4/2025 2:04 PM
6/4/2025 2:04 PM
Integration failed; field erroneously marked as required.
TC-00016-00
Info
UAT1
6/4/2025 2:04 PM
6/4/2025 2:04 PM
Integration failed; field erroneously marked as required.
TC-00016-00
Info
UAT1
6/4/2025 1:15 PM
6/4/2025 1:15 PM
Windchill workflow processed through Product Eng.; XML file created.